Silver Birches Island

A Muskoka Boathouse down to the ground, and from the ground up again… Take a glimpse into a revealing example of the lengths taken to ensure complete constructional integrity.

 Planned in the fall of 2012, this fading 4 slip boathouse was beginning to show signs of deterioration. The plan pre-posed a complete overhaul, keeping the original footprint and adding some new design features.  The existing boathouse and cribs were removed and replaced with a fully rebuilt steel dock housing, engineered to accommodate the new custom built structure. The Silver Birches Island Boathouse project was completed July of 2013.

Demolition Photos

Under Construction Photos

Completion Photos

Back to top