A Muskoka Boathouse down to the ground, and from the ground up again… Take a glimpse into a revealing example of the lengths taken to ensure complete constructional integrity.
Planned in the fall of 2012, this fading 4 slip boathouse was beginning to show signs of deterioration. The plan pre-posed a complete overhaul, keeping the original footprint and adding some new design features. The existing boathouse and cribs were removed and replaced with a fully rebuilt steel dock housing, engineered to accommodate the new custom built structure. The Silver Birches Island Boathouse project was completed July of 2013.
Demolition Photos
View the embedded image gallery online at:
http://laketolakeconstruction.com/index.php/gallery/99-silver-birches-island-lake-joseph-completed#sigProId57a914a775
http://laketolakeconstruction.com/index.php/gallery/99-silver-birches-island-lake-joseph-completed#sigProId57a914a775
Under Construction Photos
View the embedded image gallery online at:
http://laketolakeconstruction.com/index.php/gallery/99-silver-birches-island-lake-joseph-completed#sigProId54d80e41b1
http://laketolakeconstruction.com/index.php/gallery/99-silver-birches-island-lake-joseph-completed#sigProId54d80e41b1
Completion Photos
View the embedded image gallery online at:
http://laketolakeconstruction.com/index.php/gallery/99-silver-birches-island-lake-joseph-completed#sigProId77699bb53c
http://laketolakeconstruction.com/index.php/gallery/99-silver-birches-island-lake-joseph-completed#sigProId77699bb53c